The Department of Transportation announced the following Hawaiʻi Island lane closures during the week of February 5, 2024. Lane closure schedules may change without notice at any time. All projects are weather permitting.
MAMALAHOA HIGHWAY/HAWAII BELT ROAD (ROUTE 11)
KEAAU
Right shoulder closure on Hawaii Belt Road (Route 11) in the southbound direction between mile post 6.1 and 6.2, in the vicinity of Kipimana Street, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for the installation and upgrading of telecom poles, conduits, and traffic cabinets.
MOUNTAIN VIEW
Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 15 and 16, in the vicinity of North Peck Road, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 4:30 p.m. for vegetation cutting.
PAHALA
Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 51 to 53, on Monday, Feb. 5 through Friday Feb. 9 from 8:30 a.m. to 4:30 p.m. for vegetation cutting.
CAPTAIN COOK
Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 89 and 93, in the vicinity of Papalani Road, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 4:30 p.m. for vegetation cutting.
CAPTAIN COOK
Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 97.2 to 104.7, in the vicinity of Haleili Street and Filipino Clubhouse Road, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 4:30 p.m. for crews to work on safety improvements of the roadway.
KEALAKEKUA
Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile post 111.40 t0 111.47, in the vicinity of Hale Keekee Place, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for the replacement of the sidewalks that connect to the crosswalks.
HAWAII BELT ROAD (ROUTE 19)
PAPAIKOU
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile post 6.2 and 6.4, in the vicinity of Kapue Stream Bridge beginning Monday, Feb. 5 through Friday, Feb. 9 from 7 a.m. to 6 p.m. for emergency repairs to Kapue Stream Bridge.
HAKALAU
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction, between mile post 15.5 and 17.6, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for the application of new lane striping and reflective markers.
PAPAALOA TO OOKALA
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction, between mile post 23 and 27.6, in the vicinity of Stevens Road, on Monday, Feb. 5 through Friday, Feb. 9, from 8:30 a.m. to 3 p.m. for applying new roadway striping and reflective markers.
KEAAU-PAHOA ROAD (ROUTE 130)
KEAAU
Shoulder closure on Keaau-Pahoa Road (Route 130) possible in either direction between mile post 0 and 4.2, in the vicinity of Hawaii Belt Road and Pohaku Drive, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for the installation and upgrading of telecom poles, conduits and traffic cabinets.
MAMALAHOA HIGHWAY (ROUTE 190)
PUUANAHULU
Single lane closure on Mamalahoa Highway (Route 190) possible in either direction between mile post 16.9 and 26.02, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for application of new striping and reflective markers on the roadway.
KOHALA MOUNTAIN ROAD (ROUTE 250)
KAMUELA
Single lane closure on Kohala Mountain Road (Route 250) possible in either direction between mile post 6.17 and 10.6, Monday, Feb. 5 through Friday, Feb. 9 from 8 a.m. to 5:30 p.m. for resurfacing and reconstructing the roadway and weakened shoulder.
KAMUELA
Single lane closure on Kohala Mountain Road (Route 250) possible in either direction between mile post 9 and 14, on Monday, Feb. 5 through Friday, Feb. 9 from 8 a.m. to 5:30 p.m. for vegetation cutting.
PUAINAKO STREET (ROUTE 2000)
HILO
Single lane closure on Puainako Street (Route 2000) possible in either direction in the vicinity of Hawaii Belt Road and Komohana Street, beginning Monday, Feb. 5 through Friday, Feb. 9 from 8:30 a.m. to 3 p.m. for preparation work for an upcoming paving project.